[水电煤相关] 请Plumber安装厕所之后的certificate长什么样子的? [复制链接]

发表于 2013-9-27 15:04 |显示全部楼层
此文章由 qqyang 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 qqyang 所有!转贴必须注明作者、出处和本声明,并保持内容完整
有没有人知道请Plumber安装厕所之后的certificate长什么样子的?

我不记得有这样一张纸,但是我的马桶需要保修,厂商需要我提供这个certification。

有没有人知道这个长啥样的?或者正式名称是什么?撒分谢了!
Be nice, be calm.
Advertisement
Advertisement

发表于 2013-9-27 15:07 |显示全部楼层
此文章由 北京吉普 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 北京吉普 所有!转贴必须注明作者、出处和本声明,并保持内容完整
关注,帮顶

发表于 2013-9-27 16:22 |显示全部楼层
此文章由 alook 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 alook 所有!转贴必须注明作者、出处和本声明,并保持内容完整
你买马桶的发票就是凭据。

发表于 2013-9-27 16:25 |显示全部楼层
此文章由 qqyang 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 qqyang 所有!转贴必须注明作者、出处和本声明,并保持内容完整
alook 发表于 2013-9-27 16:22
你买马桶的发票就是凭据。


他们要求一个凭证是licensed plumber安装的
Be nice, be calm.

发表于 2013-9-27 16:27 |显示全部楼层
此文章由 alook 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 alook 所有!转贴必须注明作者、出处和本声明,并保持内容完整
qqyang 发表于 2013-9-27 16:25
他们要求一个凭证是licensed plumber安装的

INVOICE 是凭据,你的水管工会给你收据提到马桶一事

发表于 2013-9-27 16:31 |显示全部楼层
此文章由 qqyang 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 qqyang 所有!转贴必须注明作者、出处和本声明,并保持内容完整
alook 发表于 2013-9-27 16:27
INVOICE 是凭据,你的水管工会给你收据提到马桶一事


哦,收据里面只有一个大项目renovation of bath room,没有提马桶。
Be nice, be calm.
Advertisement
Advertisement

发表于 2013-9-27 16:33 |显示全部楼层
此文章由 豆汁小鼓 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 豆汁小鼓 所有!转贴必须注明作者、出处和本声明,并保持内容完整
You, the Licensed Plumbing Practitioner, must issue a compliance certificate for all plumbing work that falls into the following types:
Where the total value of work, including materials and any appliances, labour and GST, is more than $750 (material costs must be included, regardless of whether the materials, or appliances, were supplied by another person)
The installation, relocation or replacement of any Type A gas-using appliances, regardless of the cost (Compliance Certificates do not apply to Type B gasfitting work)
The conversion of a gas-using appliance for use with a different gaseous fuel
The installation, modification or relocation of consumer gas piping (other than work carried out on behalf of a gas company)
The construction, installation or alteration of any below ground sanitary drain or associated gullies
The construction, installation, alteration, relocation or replacement of a cooling tower or of any other part of a cooling tower system (including the installation or replacement of any associated device or equipment.
You must issue a completed Compliance Certificate within five days of the completion of plumbing work or within five days of the termination of a plumbing work contract. Details of the Compliance Certificate must also be lodged with us within five days of completion of plumbing work. Plumbing work is considered to be completed when the work is used (other than for a test), or when capable of being used within an existing system - whichever comes first.
What details should be on the Compliance Certificate?

You must enter all relevant details on the Compliance Certificate prior to issuing it, including:
Your name and licence number
Site address, including postcode
Date when the work was completed
Circle the numeric code for each category of plumbing work undertaken, and rule a line through categories not undertaken
Where applicable, enter the six-digit consent number and confirmation that you have lodged 'as-laid' plan with the relevant water authority
Details of appliances and fixtures installed with any comments you consider necessary to specify the extent of the work you have carried out
If for any reason you do not complete the work, note that the work was not completed, why it was not completed and to what stage it was completed (you must still issue a compliance certificate for incomplete plumbing work you have undertaken that is valued in excess of $750)
Your signature and the date signed, together with the statement that (either):
The plumbing work was carried out by you, or it was done under your supervision
You have inspected and tested the work started by another licensed plumbing practitioner. Any necessary completion work was carried out by you or under your supervision.

发表于 2013-9-27 16:34 |显示全部楼层
此文章由 alook 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 alook 所有!转贴必须注明作者、出处和本声明,并保持内容完整
qqyang 发表于 2013-9-27 16:31
哦,收据里面只有一个大项目renovation of bath room,没有提马桶。

可以和水管工沟通一下,然后手头写下包括马桶在内,只要你有证据(包括会谈记录,请他事后签字,或记下会谈内容时间地点日期,即便去法院都可作为依据-THIS  IS YOUR EVIDENCE JUST IN CASE