Opal Tower 建筑问题的根源在于开发商无节制的挤压成本 [复制链接]

发表于 2018-12-27 14:59 |显示全部楼层
此文章由 Jasondudu1212 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 Jasondudu1212 所有!转贴必须注明作者、出处和本声明,并保持内容完整
本帖最后由 Jasondudu1212 于 2018-12-27 16:30 编辑

'Huge pressure': Developers cutting costs are root cause of defects

https://www.smh.com.au/national/ ... 0181226-p50o97.html

资深业内人士写的一篇揭露建筑行业潜在问题的文章 很有意义

A 36-storey tower at Sydney Olympic Park is evacuated putting thousands of residents on the street on Christmas Eve. Building movement, loud bangs and big cracks are reported. All this in a building that has opened only recently. The architect, structural engineer and builder are all respected players in the industry.

Much time will now be spent to find cause and culprit. Is the problem a significant structural issue, as it appeared from first reports? And if it is, is it the fault of an individual error by designer or builder or a sign of a wider problem in the industry


An investigation into the structural integrity of a recently-finished building at Sydney's Olympic Park has been launched by the NSW Government.
At this stage we cannot say for sure, but we can say that away from the headlines a pattern is emerging industry-wide. Down the road from the Opal building, a relatively new, high-rise residential building has not made front page news but is also having problems. The structural failure has been more gradual. The building's cantilevered balconies started sagging gradually soon after occupation. Some balconies have sagged as much as 180mm on the outer edges over three years. As a result, cracks have opened up, water runs away from the outlets and pools on the balconies. Major structural repair works are being commissioned.

A similar unreported story is to be told at a nearby 300-unit block. Structural deficiencies have led to major deflection of cantilevered concrete slabs. This structural defect is just one item in $6 million dollars worth of waterproofing and other faults found in this new building.
Advertisement
In the ACT, residents in a new, high-profile high-rise apartment are woken every two hours or so during the night by a large banging sound. Have been for years. Structural deficiencies mean that the roof slab scrapes across support walls when it cools down at night. The resulting nocturnal crescendo has been the subject of prolonged court action and numerous expert reports. To borrow a phrase, design success has many parents, building defects are orphans.

The 33-storey Opal Tower was completed in August.
The 33-storey Opal Tower was completed in August. CREDIT:AAP
Such stories are being lived throughout our apartment boom-burdened major cities by owners who suspected nothing when they bought. Culprits and scapegoats for these and other defects are sometimes found but root causes are rarely identified.

I am not a structural engineer but I work with architects, builders and structural engineers dealing with major facade and waterproofing defects. A forensic approach is needed to look at the process that leads to a defect, including the design stage, rather than just looking at the material issue in isolation.

A root cause common to many of these types of defects is the way design risk has been managed in the building industry over the last decade or so. Key elements of structural and other design are passed though many hands before emerging triumphant on the skyline. Huge pressure is placed on the various designers by developers and builders to reduce time and cost. They are asked to deliver ever thinner, lighter structures which are quicker and cheaper to build. The margins for error are reduced. The long-term effects are discounted in favour of short-term financial gain。
This does not necessarily apply to the Opal Tower, but is an observation of the industry at large.

这些建筑问题的根源在于设计风险的控制模式。关键结构部件的设计在最后成形前都要经过很多次转手。设计师们常常承受着来自开发商和建造商的非人压力,要尽一切可能的去节省建造费用和缩短工期。设计师们总是被要求提供更薄,更轻的结构使得建造更快,更容易。这样一来安全系数被极大的压缩了。结构长期的影响被牺牲了,用于来换取短期的最大利润。


This management approach has reached its zenith in the wide use of design-and-construct contracts to commission many high-rise projects. These contracts, which supply builders with the first half of the design (which builders then have to finish) are often the first stop for developers looking to reduce cost and time of a project. The builder then takes responsibly for the design, however inadequate, and has to meet the developer's budget and time restrictions, however inadequate, and manage further tweaking of key design elements by the developer to cut costs even more.

Correcting this process is at the heart of preventing major defects in the building industry today. It begins with recognising the role that developers, at the apex of the design process, play in influencing the design of these buildings and the sometimes negative outcomes that arise.

Ross Taylor is the managing director of Ross Taylor and Associates, waterproofing consultants.
Advertisement
Advertisement

发表于 2018-12-27 21:11 |显示全部楼层
此文章由 老衲 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 老衲 所有!转贴必须注明作者、出处和本声明,并保持内容完整
根本原因是自由党政府集体收受建筑商贿赂,放松监管

发表于 2018-12-27 21:26 |显示全部楼层
此文章由 audi 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 audi 所有!转贴必须注明作者、出处和本声明,并保持内容完整
开发商背锅了

开发商在检举一下建筑商吧

发表于 2018-12-28 15:31 |显示全部楼层
此文章由 Jasondudu1212 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 Jasondudu1212 所有!转贴必须注明作者、出处和本声明,并保持内容完整
开发商背锅也不冤枉
开发商也给承建商很大的压力

发表于 2018-12-30 22:53 |显示全部楼层
此文章由 hutu 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 hutu 所有!转贴必须注明作者、出处和本声明,并保持内容完整
这帖子的观点跟我在大千的帖子不谋而合

发表于 2018-12-31 02:47 |显示全部楼层
此文章由 fljrc 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 fljrc 所有!转贴必须注明作者、出处和本声明,并保持内容完整
老衲 发表于 2018-12-27 22:11
根本原因是自由党政府集体收受建筑商贿赂,放松监管

抓起来
赢 赢 赢
Advertisement
Advertisement
头像被屏蔽

禁止发言

发表于 2019-1-4 06:01 |显示全部楼层
此文章由 ARACT 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 ARACT 所有!转贴必须注明作者、出处和本声明,并保持内容完整
本帖最后由 ARACT 于 2019-1-4 07:03 编辑

NSW 政府的腐败,触目惊心, 根本没有监管。
最近还有报道,盖楼建设高度超过了审批的高度。

现在调查Opel Tower的人,还是NSW 政府,自己检查自己,这不是监守自盗吗? 能查出来实质性问题?

发表于 2019-1-4 07:54 |显示全部楼层
此文章由 sun2012 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 sun2012 所有!转贴必须注明作者、出处和本声明,并保持内容完整
建筑行业水太深,2000年以后的建的房子如果严格按照规范检查,合格的很少

新闻达人 2019年度勋章

发表于 2019-1-4 08:42 |显示全部楼层
此文章由 Y叔 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 Y叔 所有!转贴必须注明作者、出处和本声明,并保持内容完整
做为开发商,追求利润最大化是必然的,不光是开发商,任何一家商业公司都是利益驱使的。问题是,设计师和结构工程师必须按照澳洲的建筑标准设计,建筑公司必须按照设计施工,否则出了问题就是他们的责任。开发商可以完全是外行,根本不懂建筑的,他们出资由专业人员做具体工作,有问题应该由有资质的专业人员负责。这些所有的人当中,只有开发商是不需要任何学历资历和证书的。
至于审批私有化,维州已经很多年了,在法规框架内也不通过政府。请不要把党派政治扯进来。
换句话说,开发商可以要求利润空间,但是必须在法规的框架内。毕竟图纸不是开发商画的,图纸上也没有盖着开发商的印章。

发表于 2019-1-5 08:52 来自手机 |显示全部楼层
此文章由 delta210 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 delta210 所有!转贴必须注明作者、出处和本声明,并保持内容完整
按规范复查呗

发表于 2019-1-25 17:54 |显示全部楼层
此文章由 dyzinsyd 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 dyzinsyd 所有!转贴必须注明作者、出处和本声明,并保持内容完整
没什么用的文章。都在降成本。
Advertisement
Advertisement
头像被屏蔽

禁止发言

发表于 2019-1-25 17:57 |显示全部楼层
此文章由 thatsfine 原创或转贴,不代表本站立场和观点,版权归 oursteps.com.au 和作者 thatsfine 所有!转贴必须注明作者、出处和本声明,并保持内容完整
根源在于炒房的吧
有需求才有供给的啊